2020-04-03T04:17:34.399723+00:00
Incident impacting MONTREAL DATA CENTRE

After an investigation by our sysadmin team, it appears that the issue was the result of a faulty kernal patch. The patch required a manual reboot of the VM, which resulted in approx. 7 minutes of downtime. Previous to this 7 minutes of downtime, this cluster has been up 100% for 686 days.

Status remaining
Fully Operational
2020-04-03T14:11:52.790592+00:00

The montreal1000 cluster is now responding & serving sites. It was down for 6 minutes and 6 seconds. Details will be posted here on the cause once our sysadmins properly investigate.

Status changed to
Fully Operational
2020-04-03T04:20:09.984333+00:00

We're currently investigating an outage that is affecting the montreal1000 cluster.

Status changed to
Major Outage
2020-04-03T04:17:34.399747+00:00
Back to Current Status